Well im realy sorry that i haven't blogged since day 2 of the build but im not sure where the time has gone. We started the house build and got engaged on the same day then after a few days of celebrations we were at the site alot and were not getting home till late. Then on thursday i wasn't to well but still made it down for an hour later in the day.
So the last time i posted we were having truck loads of stone put on the foundation. Well now all 30 truck loads are done and it has all been flattened with channels around the rooms for the steal to go into. Then on wednesday,thursday and friday the raft/steal went in and Sean our engineer came out to inspect the site so we can apply for our second stage payment cheque. Then on saturday the concrete arrived and in the rain (which is good weather for pooring concrete) they filled the foundation. Mj and i missed this as we were in Dublin but went over to the site as soon as we were home and you can now see the exact size of the house now. Its all so exciting and things are moving very smoothly and quickly as it has only been 9 days. The block layer is starting on wednesday when the concrete is dry and he will have 6 layers up in the 1st day (weather permitted) and 4 layers up on the 2nd day and it will realy look like a house by next weekend! Im sorry i haven't posted any pictures yet but i do have loads! My brother had made me a website and im still learning how to use it but when i have had a long chat with him i will be putting all pictures on there and a link on all blog posts for you all to see!
xx